Independent Engineer Services for Operation & Maintenance of following Projects under Built Operate & Transfer basis in the State of Gujarat: Upgradation of Shantipura Chokdi to Khoraj GIDC Chokdi State Highway-17 from existing 4-Lane with Paved Shoulder to 6-Lane and Service Road on BOT (Toll) basis (Ch km 13+930 to km 42+683)
- Client Name : GSRDC
- Year : 2025
- Project Status : Ongoing
Consultancy Work for “Preparation of Detailed Project Report (DPR) and GAD of 2 Nos. ROB and Approval from Railway for Construction of four lane Road from Fathepur road to Nawalgarh Road (6.5km) with 2 ROB Dist Sikar
- Client Name : PWD, Rajasthan
- Year : 2025
- Project Status : Ongoing
Consultancy Work for “Preparation of Detailed Project Report (DPR) and GAD of 2 Nos. ROB and Approval from Railway for Construction of four lane Road from Fathepur road to Nawalgarh Road (6.5km) with 2 ROB Dist Sikar
- Client Name : PWD, GoR, Rajasthan
- Year : 2025
- Project Status : Ongoing
Independent Engineer Services for Operation & Maintenance of following of Projects under Built Operate & Transfer basis in the State of Gujarat.
- Ahmedabad- Viramgam-Maliya Road SH-7 & 17
- Rajkot-Jamnagar-Vadinar Road SH-25
- Halol-Godhra-Shamlaji Road, SH-5
- Deesa-Panthawada-Gundari Road, SH-7
- Client Name : Managing Director GSRDC, Gandhinagar
- Year : 2025
- Project Status : Ongoing
Consultancy Services for “Independent Consultant for Mehsana-Himatnagar four laning From Km 103+000 to Km 163+751 section of SH-55 on DBFOT Design, Build, Finance, Operate & Transfer Annuity Contract under GSHP-II for Operation Period”
- Client Name : Superintending Engineer (World Bank) Gandhinagar
- Year : 2023
- Project Status : Ongoing
Consultancy Services for “Independent Consultant for Mehsana-Himatnagar four laning From Km 103+000 to Km 163+751 section of SH-55 on DBFOT Design, Build, Finance, Operate & Transfer Annuity Contract under GSHP-II for Operation Period”
- Client Name : Superintending Engineer (World Bank) Gandhinagar
- Year : 2023
- Project Status : Ongoing
Services of Independent Engineer for Two Laning with Paved Shoulders of Stretches of State Highways under SHDP mainly operated and maintained on (DBFOT) Annuity Basis State Highway Development Project (SHDP) Package-01 to 08 in the state of Gujarat
- Client Name : Superintending Engineer, State Highway Devlopment Project (SHDP) ,R&B , Gandhinagar, GujaratManaging Director GSRDC, Gandhinagar
- Year : 2017
- Project Status : Ongoing
Services of Independent Engineer for the augmentation of 2 lane paved shoulder under change of Scope of Dwarka to Okha Road from Km 232+000 to Km 261+750 section of SH-25. into 4 Laning with paved shoulder of Dwarka to Okha Road from km 232+000 to Km 261+750 section of SH-25 under in the state of Gujarat
- Client Name : Superintending Engineer, State Highway Development Project (SHDP) , R&B , Gandhinagar, Gujarat
- Year : 2023
- Project Status : Ongoing
Services of Independent Engineer for the augmentation of 2 lane paved shoulder under change of Scope of Dwarka to Okha Road from Km 232+000 to Km 261+750 section of SH-25. into 4 Laning with paved shoulder of Dwarka to Okha Road from km 232+000 to Km 261+750 section of SH-25 under in the state of Gujarat
- Client Name : Superintending Engineer, State Highway Development Project (SHDP) , R&B , Gandhinagar, Gujarat
- Year : 2023
- Project Status : Ongoing
Consulting Services for “Independent Consultant for Mehsana-Himatnagar four laning on DBFOMT Annuity Contract under GSHP-II for Operation Period” in the state of Gujarat
- Client Name : Superintending Engineer Project Implementation Unit, (World Bank), Gandhinagar, Gujarat
- Year : 2023
- Project Status : Ongoing
Safety Consultant for (1) Upgradation and Strengthening of Khanvel Junction to Khedpa up to Maharashtra Border road (Ch. 19+400 to Ch. 40+470). (2) Upgradation and Strengthening of Khanvel Junction to Dudhani Junction (Ch. 19+400 to Ch. 35+022) Submission of Invoice RKC/KJ/01
- Client Name : RKC, Ahmedabad, Gujarat
- Year : 2023
- Project Status : Ongoing
Safety Consultant for (1) Upgradation and Strengthening of Khanvel Junction to Khedpa up to Maharashtra Border road (Ch. 19+400 to Ch. 40+470). (2) Upgradation and Strengthening of Khanvel Junction to Dudhani Junction (Ch. 19+400 to Ch. 35+022) Submission of Invoice RKC/KJ/01
- Client Name : RKC, Ahmedabad, Gujarat
- Year : 2023
- Project Status : Ongoing
Consultancy work for quarterly basis verification and validation of exempted traffic count by way of manual survey & Video Graphical survey of categorize vehicles (Car) count on Ahmedabad Ring Road from Km 0+000 to Km 76+000 4-lane Road at Seven Toll Plaza locations of Project Road
- Client Name : The Chief Executive Officer, Ahmedabad Urban Development Authority & ARRIL, Gujarat
- Year : 2022
- Project Status : Ongoing
Project Management Consultancy Services for Proposed laying of 1200 mm dia. RCC NP-4 Storm Water pipe line through 1700 mm dia. MS Casing Pipe Under the Railway track at Km 399/4-5 Between Naroda & Dabhoda Railway Stations on ADI-HMT Section
- Client Name : The Additional City Engineer, Water Project, Ahmedabad Municipal Corporation, Gujarat
- Year : 2022
- Project Status : Ongoing
Project Management Consultancy Services for Proposed laying of 1200 mm dia. RCC NP-4 Storm Water pipe line through 1700 mm dia. MS Casing Pipe Under the Railway track at Km 399/4-5 Between Naroda & Dabhoda Railway Stations on ADI-HMT Section
- Client Name : The Additional City Engineer, Water Project, Ahmedabad Municipal Corporation, Gujarat
- Year : 2022
- Project Status : Ongoing
Consultancy Services for Traffic Count including license plate registration survey of categorizes vehicles (Cars) count with videography at Ahmedabad Ring Road from Km 0+000 to Km 76+000 4-lane Road in at 7(Seven)Toll Plaza locations of Project Road in the State of Gujarat.
- Client Name : The Chief Executive Officer, Ahmedabad Urban Development Authority & ARRIL, Gujarat
- Year : 2022
- Project Status : Completed
Project Management Consultancy Services for Widening and construction of ROB Khodiyar at Km 515/9-10 between Station SBI-KHD section (Railway portion only)
- Client Name : Executive Engineer , National Highway Division , Ahmedabad, Gujarat
- Year : 2021
- Project Status : Completed
Project Management Consultancy Services for Widening and construction of ROB Khodiyar at Km 515/9-10 between Station SBI-KHD section (Railway portion only)
- Client Name : Executive Engineer , National Highway Division , Ahmedabad, Gujarat
- Year : 2021
- Project Status : Ongoing
Consultancy Services of Annual Potential Collection Survey for the Alwa Kampa Toll Plaza (At Km 80+980 of SH-59) on ‘Nadiad – Mahudha – Kathlal – Kapadwanj – Bayad – Modasa Section from Km 0+600 to Km 109+000’ under SHDP DBFOT Annuity Packages -8.
- Client Name : Superintending Engineer, State Highway Development Project (SHDP) ,R&B , Gandhinagar, Gujarat
- Year : 2021
- Project Status : Completed
Safety Consultancy Services for 4 Lane laning with paved shoulder paved of Madhavpur to Porbandar Section of NH-8E (ext) old NH-51(new) from km 338+400 (design) Chainage km 338+400) to km 379+100 (Design Chainage km 379+100) in the state of Gujarat
- Client Name : KALTHIA ENGINEERING & CONSTRUCTION LIMITED, AHMEDABAD, GUJARAT
- Year : 2021
- Project Status : Ongoing
Safety Consultancy Services for 4 Lane laning with paved shoulder paved of Madhavpur to Porbandar Section of NH-8E (ext) old NH-51(new) from km 338+400 (design) Chainage km 338+400) to km 379+100 (Design Chainage km 379+100) in the state of Gujarat
- Client Name : KALTHIA ENGINEERING & CONSTRUCTION LIMITED, AHMEDABAD, GUJARAT
- Year : 2021
- Project Status : Ongoing
Project Management Consultancy Services for Proposed laying of 2200 mm dia RCC NP-4 Drainage pipe line through 3500mm x 3500mm RCC Box Under the Railway track at Km 490/8-9 Between Vatva & Maninagar Stations on GER-ADI Section
- Client Name : The Additional City Engineer, Water Project, Ahmedabad Municipal Corporation, Gujarat
- Year : 2021
- Project Status : Ongoing
Widening and construction of ROB Sola at Km 508/9-509/0 between Station ADI-SAU on ADI – VG section
- Client Name : Executive Engineer, National Highway Division, Ahmedabad, Gujarat
- Year : 2021
- Project Status : Completed
Widening and construction of ROB Sola at Km 508/9-509/0 between Station ADI-SAU on ADI – VG section
- Client Name : Executive Engineer, National Highway Division, Ahmedabad, Gujarat
- Year : 2021
- Project Status : Completed
Safety Consultancy Service for “ Development of Chiloda – Gandhinagar of NH- 147 ( Old NH-8C) From Km 0+0 to 44+420 in state of Gujarat to Six –lane with paved Shoulder with both side Continues service road on EPC Mode ( job no 147/GJ/2017-18/607) Package-1 km 0+0 to 16+350
- Client Name : KECL, Ahmedabad
- Year : 2020
- Project Status : Completed
Safety Consultant for Up-gradation of 2 Lane with Paved Shoulder for section from Km 118.900 to km 156.955 (excluding ch.151.100 to 154.730 of Balotra to Sanderao via Jalore (excluding ongoing BOT Project) Section of NH-325 in the State of Rajasthan on EPC mode ( Package-III)
- Client Name : KECL, Ahmedabad
- Year : 2020
- Project Status : Completed
Safety Consultant for Up-gradation of 2 Lane with Paved Shoulder for section from Km 118.900 to km 156.955 (excluding ch.151.100 to 154.730 of Balotra to Sanderao via Jalore (excluding ongoing BOT Project) Section of NH-325 in the State of Rajasthan on EPC mode ( Package-III)
- Client Name : KECL, Ahmedabad
- Year : 2020
- Project Status : Completed
Proposed laying of 1800mm dia. MS Water pipeline through 2500 X 3000 mm RCC Box under the track at Km 396/5-6 between Naroda and Medra Railway stations on Ahmedabad-Himmatnagar rail section by Additional City Engineer (Water Project)
- Client Name : The Additional City Engineer, Water Project, Ahmedabad Municipal Corporation, Gujarat
- Year : 2020
- Project Status : Completed
Safety Consultancy Services for Rehabilitation of Valbhipur ( Km 0+965 to Rangola (km 27+588) Section of SH-39 of Second Gujarat State Highway Project (GSHP)
- Client Name : KECL, Ahmedabad, Gujarat
- Year : 2020
- Project Status : Ongoing
Safety Consultancy Services for Rehabilitation of Valbhipur ( Km 0+965 to Rangola (km 27+588) Section of SH-39 of Second Gujarat State Highway Project (GSHP)
- Client Name : KECL, Ahmedabad, Gujarat
- Year : 2020
- Project Status : Ongoing
Consultancy work for traffic count survey of categorize vehicles (2-Wheeler, 3-Wheeler, Car, LCV and State Bus) count at (i) Vadodara –Halol Section of SH-87 From Km 8+300 to 40+000 (4-lane Road) &(ii) Ahmedabad –Mehsana Section of SH-41 From Km 19+000 (Adalaj) to Km 70+000 (Mehsana)
- Client Name : The Additional City Engineer, Water Project, Ahmedabad Municipal Corporation, Gujarat
- Year : 2020
- Project Status : Ongoing
Consultancy Services for Preparation of Detailed Project Report for Construction of two lane Road to Major Bridge (MJB) on MDR and Village Roads of Mota Dedarada to Vasana Khudra Road at ch-0.00 to ch 0.200 Ta.Kheda under M.M.G.S.Y.S.C.S.P
- Client Name : The Executive Engineer, Panchayat (R&B) Kheda Division, Nadiad, Gujarat
- Year : 2020
- Project Status : Ongoing
Consultancy Services for Preparation of Detailed Project Report for Construction of two lane Road to Major Bridge (MJB) on MDR and Village Roads of Mota Dedarada to Vasana Khudra Road at ch-0.00 to ch 0.200 Ta.Kheda under M.M.G.S.Y.S.C.S.P
- Client Name : The Executive Engineer, Panchayat (R&B) Kheda Division, Nadiad, Gujarat
- Year : 2020
- Project Status : Ongoing
Consultancy Services For Preparation Of Detailed Project Report For Construction Of Two – Lane Road Six Major Bridges (Mjb) On Mdr And Village Roads Of Kheda District Panchayat Division In The State Of Gujarat.” Road Length Km 0+200 to 0+400
- Client Name : The Executive Engineer, Panchayat (R&B) Kheda Division, Nadiad, Gujarat
- Year : 2020
- Project Status : Ongoing
Construction of Additional Two lane for Ahmedabad-Viramgam-Maliya Road (SH-7& 17) to make it four lane divided carriageway facility under Viability Gap Funding Scheme of Government of India on BOT basis Appointment of Safety Auditor
- Client Name : GSRDC
- Year : 2025
- Project Status : Ongoing
Construction of Additional Two lane for Ahmedabad-Viramgam-Maliya Road (SH-7& 17) to make it four lane divided carriageway facility under Viability Gap Funding Scheme of Government of India on BOT basis Appointment of Safety Auditor
- Client Name : GSRDC
- Year : 2025
- Project Status : Ongoing
Safety Consultant for “Upgradation of Mehsana Bypass Section of SH-41 A from Panchot Junction (Km 11+743) to Fatehpura Junction (Km 16+450) from 2-Lane to 4-Lane Divided Carriageway Configuration” in the State of Gujarat under Second -Gujarat State Highway Project (GSHP-II/EPC/02) on EPC basis.
- Client Name : Superintending Engineer , PIU, Gandhinagar, Gujara
- Year : 2019
- Project Status : Completed
Safety Consultant for “Rehabilitation of Radhanpur (Km 0+000) to Chanasma (Km 60+410) Section of SH-55” in the State of Gujarat under Second -Gujarat State Highway Project (GSHP-II/EPC/02) on EPC basis.
- Client Name : Superintending Engineer , PIU, Gandhinagar, Gujarat
- Year : 2019
- Project Status : Completed
Safety Consultant for “Rehabilitation of Radhanpur (Km 0+000) to Chanasma (Km 60+410) Section of SH-55” in the State of Gujarat under Second -Gujarat State Highway Project (GSHP-II/EPC/02) on EPC basis.
- Client Name : Superintending Engineer , PIU, Gandhinagar, Gujarat
- Year : 2019
- Project Status : Completed
Consultancy Services in Road Safety Audit work to various Road widening and four laning Road works under Capital project Division-3 Gandhinagar (C.R.F).
- Client Name : Executive Engineer, Capital project Division-3 Gandhinagar (C.R.F), Gujarat
- Year : 2019
- Project Status : Completed
Project Management Consultancy Services for construction for Railway Under Bridge (RUB) under the Railway track for providing road connectivity on the either side of Railway track between ‘K’ road and ‘KH’ road near Salt Mount of Mahatma Mandir Gandhinagar-Gujarat
- Client Name : Executive Engineer, Capital Division -3 Gandhinagar, Gujarat
- Year : 2018
- Project Status : Completed
Project Management Consultancy Services for construction for Railway Under Bridge (RUB) under the Railway track for providing road connectivity on the either side of Railway track between ‘K’ road and ‘KH’ road near Salt Mount of Mahatma Mandir Gandhinagar-Gujarat
- Client Name : Executive Engineer, Capital Division -3 Gandhinagar, Gujarat
- Year : 2018
- Project Status : Completed
Consultancy Services in Road Safety Audit work to various Road widening and four Laning Road works under Capital project Division-3 Gandhinagar (5054 C.O 337 Road)
- Client Name : Executive Engineer, Capital project Division-3 Gandhinagar (C.R.F), Gujarat
- Year : 2018
- Project Status : Completed
Consultancy Services in Road Safety Audit work to various Road widening and four Laning Road works under Capital project Division-3 Gandhinagar (5054 C.O 337 Road)
- Client Name : Executive Engineer, Capital project Division-3 Gandhinagar (C.R.F), Gujarat
- Year : 2018
- Project Status : Completed
Consultancy Services for preparation of detailed project report for Railway Under Bridge (RUB) under the Railway track for providing road connectivity on the either side of Railway track between ‘K’ road and ‘KH’ road near Salt Mount of Mahatma Mandir Gandhinagar-Gujarat
- Client Name : Executive Engineer, Capital Division 3 Gandhinagar, Gujarat
- Year : 2018
- Project Status : Completed
Engaging Consultancy Service for preparation of General Arrangement drawing etc. for the works of Construction of proposed ROB and its approaches in replacement of existing Level Crossing No.87 on NH 848-B at Udvada Railway crossing @ Km 28/4 to 28/6 on EPC mode under NH (O) in the state of Gujarat.
- Client Name : The Executive Engineer, National Highway Division Bharuch
- Year : 2024
- Project Status : Ongoing
Engaging Consultancy Service for preparation of General Arrangement drawing etc. for the works of Construction of proposed ROB and its approaches in replacement of existing Level Crossing No.87 on NH 848-B at Udvada Railway crossing @ Km 28/4 to 28/6 on EPC mode under NH (O) in the state of Gujarat.
- Client Name : The Executive Engineer, National Highway Division Bharuch
- Year : 2024
- Project Status : Ongoing
Consultancy Services for preparation of Detailed Project Report for Widening of existing 2-Lane to 4-Lane of Morbi Bypass to Navalakhi Port from Km 67+000 to 108+000 (SH-24) including three ROBs Under State Highway Development Program (SHDP) in the State of Gujarat
- Client Name : Superintending Engineer, State Highway Development Project (SHDP) ,R&B , Gandhinagar, Gujarat
- Year : 2019
- Project Status : Completed
We Provide the Best Service in Industry
Unlock expert engineering insights for your next infrastructure project at no cost and with no obligation.